Whole-current meters carry the full load through the meter itself and are used up to about 100 amps per phase. Above that, CT metering is needed because the cables and currents are too large for a meter to handle directly.

Whole current vs CT metering: which does your business need? – Whole current or CT?Whole current or CT?Whole currentUp to 100 Acurrent through meterCT meteringAbove 100 Avia transformersSmart optionSMETS2 forwhole current onlyUpgradeNeeds CT chamberand commissioning

When you need to move to CT metering

What the upgrade involves

The network operator may need to upgrade the service and cut-out. Your electrician installs the CT chamber, tails and main switch. The meter operator then fits the CTs and meter and commissions them. Planning all three together avoids repeat visits and power cuts.