Whole current vs CT metering: which does your business need?
Whole-current meters carry the full load through the meter itself and are used up to about 100 amps per phase. Above that, CT metering is needed because the cables and currents are too large for a meter to handle directly.
When you need to move to CT metering
- You are increasing your supply above 100 amps, for example for EV chargers, heat pumps or new machinery.
- Your whole-current meter or cut-out is running hot or close to its limit.
- Your network operator has upgraded your supply and asked for CT metering.
What the upgrade involves
The network operator may need to upgrade the service and cut-out. Your electrician installs the CT chamber, tails and main switch. The meter operator then fits the CTs and meter and commissions them. Planning all three together avoids repeat visits and power cuts.