CT meter installation: what is involved and what it costs

MeterQuotes guide · reviewed by a Chartered Engineer

A CT meter (current transformer meter) is used where a supply is too big for a standard whole-current meter, usually above 100 amps. Instead of the full current passing through the meter, current transformers on each phase send a small, proportional signal to it.

CT meter installation: what is involved and what it costs – How a CT meter gets installedHow a CT meter gets installed1SurveySupply size,photos, MPAN2Electrical prepTails, mainswitch, CT chamber3Fit CTsCurrenttransformers4Fit meterMeter andcomms5CommissionTests andrecords

Who does what

What it costs

A straightforward CT meter changeover is usually a few hundred pounds. A new CT installation with commissioning costs more, and a whole-current to CT upgrade that needs a CT chamber and electrical works can run into thousands. Supply size, access, out-of-hours working and whether power can be switched off all affect the price.

Commissioning

CT metering is not finished until it has been commissioned: the CT ratio, wiring and phase rotation are checked under load and recorded. Without that, bills can be wrong by a large factor.