CT meter commissioning: why it matters and what is checked
CT metering must be commissioned before it is relied on for billing. Under the Balancing and Settlement Code, Code of Practice 4 sets out how metering is tested and commissioned, and both the network operator and the meter operator have responsibilities.
What is checked
- The CT ratio fitted matches the ratio programmed into the meter.
- CT polarity and phase rotation are correct, so no phase reads backwards.
- The meter reading agrees with the current measured on site under load.
- Communications work and readings reach the data service.
What goes wrong
Uncommissioned or wrongly commissioned CT meters can under- or over-record for years. Back-billing disputes, missed readings and failed MHHS migration often trace back to a missing commissioning record.